-

Publications of A.B Kahng

Journal papers

  1. Y. Cao, C. Hu, X. Huang, A.B. Kahng, I.L. Markov, M. Oliver, D. Stroobandt and D. Sylvester Improved A Priori Interconnect Predictions and Technology Extrapolation in the GTX System IEEE Transactions on Very Large Scale Integration (VLSI) Systems, Special Section on System-Level Interconnect Prediction (SLIP), Vol. 11(1), pp. 3-14 (2003)
  2. C.-K. Cheng, A. Kahng, B. Liu and D. Stroobandt Toward Better Wireload Models in the Presence of Obstacles IEEE Transactions on Very Large Scale Integration Systems, Vol. 10(2), pp. 177-189 (2002)
  3. A.B. Kahng, S. Mantik and D. Stroobandt Toward Accurate Models of Achievable Routing IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems, Vol. 20(5), pp. 648-659 (2001)
  4. A. Kahng and D. Stroobandt Guest Editorial: System-Level Interconnect Prediction IEEE Transactions on Very Large Scale Integration Systems, Vol. 8(6), pp. 637 (2000)

Conference publications

  1. C.K. Cheng, A.B. Kahng, B. Liu and D. Stroobandt Toward Better Wireload Models in the Presence of Obstacles Proceedings Asia and South Pacific Design Automation Conference (ASPDAC), pp. 527-532 (2001)
  2. Y. Cao, C. Hu, X. Huang, A.B. Kahng, S. Muddu, D. Stroobandt and D. Sylvester Effects of Global Interconnect Optimizations on Performance Estimation of Deep Submicron Design Proceedings of the International Conference on Computer-Aided Design (ICCAD 2000), pp. 56-61 (2000)
  3. A. Caldwell, Y. Cao, A.B. Kahng, F. Koushanfar, H. Lu, I.L. Markov, M. Oliver, D. Stroobandt and D. Sylvester GTX: The MARCO GSRC Technology Extrapolation System Proceedings 37th IEEE/ACM Design Automation Conference, pp. 693-698 (2000)
  4. A.B. Kahng and D. Stroobandt Wiring Layer Assignments with Consistent Stage Delays UCLA Computer Science Department Research Review, pp. (2000)
  5. A.B. Kahng and D. Stroobandt Wiring Layer Assignments with Consistent Stage Delays Proceedings ACM International Workshop on System-Level Interconnect Prediction, pp. 115-122 (2000)
  6. Y. Cao, X. Huang, A.B. Kahng, F. Koushanfar, H. Lu, S. Muddu, D. Stroobandt and D. Sylvester Applications of GTX UCLA Computer Science Department Research Review, pp. (2000)
  7. A. Caldwell, A.B. Kahng, I.L. Markov, M.R. Oliver and D. Stroobandt GTX: The MARCO GSRC Technology Extrapolation System UCLA Computer Science Department Research Review, pp. (2000)
  8. A.B. Kahng, S. Mantik and D. Stroobandt Requirements for Models of Achievable Routing Proceedings ACM International Symposium on Physical Design, pp. 4-11 (2000)
  9. D. Stroobandt, A.B. Kahng and P. Christie Proceedings ACM International Workshop on System-Level Interconnect Prediction , pp. 1-151 (2000)
  10. A.B. Kahng, S. Mantik and D. Stroobandt Requirements for Models of Achievable Routing UCLA Computer Science Department Research Review, pp. (2000)
  11. A. Caldwell, A.B. Kahng, F. Koushanfar, H. Lu, I. Markov, M. Oliver and D. Stroobandt GTX: The GSRC Technology Extrapolation System, A Living Roadmap Gigascale Silicon Research Center Annual Review 1999, pp. 6-20 (1999)
  12. A.E. Caldwell, A.B. Kahng, F. Koushanfar, H. Lu, I.L. Markov, M.R. Oliver and D. Stroobandt GTX: The MARCO GSRC Technology Extrapolation System Gigascale Silicon Research Center Annual Review 1999, pp. (1999)
  13. A.B. Kahng, S. Mantik and D. Stroobandt The Real impact of Vias on Available Routing Resources Gigascale Silicon Research Center Annual Review 1999, pp. (1999)
  14. A.B. Kahng, F. Koushanfar, H. Lu and D. Stroobandt Assessing Parameter and Model Sensitivities of Cycle-Time Predictions Using GTX Gigascale Silicon Research Center Annual Review 1999, pp. (1999)
  15. D. Stroobandt and A.B. Kahng Workshop Notes Workshop Notes of the First International Workshop on System-Level Interconnect Prediction, pp. 1-130 (1999)